How to writeback scheduled data to Google Sheets and specific tab (Sheet)

Click the Schedule button on your data on Exploratory Server

On the Schedule Configuration dialog, check the “Export to Google Sheets” checkbox.
If you want to override the existing spreadsheet, check the “Existing” radio button and select an existing sheet.

For Tab (Sheet) OperationType, you have the following three options.

  • Create New Sheet
  • Override Existing Sheet
  • Add to Existing Shet.

1 Like